This is a photo of Sioux Dr. near Mohawk in the process of being repaired
This is the completed repair on Sioux Drive
Repairs were made on Mayapple near Lake Pointe Dr.
Completed repairs on Mayapple
Road work was done on North Lakeshore Dr.
We have no photos of the roads graded this past month, but here is a list of the roads worked on.
Emerald Outlook Del Oak Delago Dr. E. Canyon Wildwood Emerald Ridge Lakemoor Indian Hill Live Oak Scrub Oak Lost Hill Fourwinds Falcon View (from Lily Pond to Indian Hill) Burr Oak Green Bottom Chinkapin Oak Red Bud Spruce Leisure Union Dusk Sunswept Echo Hill Dr. Echo Hill Ct. Echo Glen Marble Hill Ruby View Canyon Fair Acres E. Lakeshore Taurus Pawnee Circle
Repairs were made to a large bad place in Driftwood at Green's Dam
This photo is after the hole was repaired
A new culvert was installed on Lakeview at Spring Lake Dr. Hopefully this will help with the water flow during heavy rains.
This is a photo of after the culvert was installed.
A new road culvert was installed on Chinkapin Oak
Driftwood, on the north side of Green's Lake was rocked
Hickory Drive was worked on this week between Black Oak and Elm.
Another photo of the repaired Hickory Drive
Work was done this past week on Phoenix Dr.
Road work being done one Echo Hill
Another photo of Echo Hill
Road work being done on Sundance & Canyon
Road work on Sugarcreek & Sundance
Road work on Indigo Bunting
Road work on Meadow View
The continuing work done on Driftwood Dr. This is a before photo of a bad place in the road.
This is a photo of the completed repair to the bad place on Driftwood Dr.
This is a photo of Orion where the water had washed out the road.
Another photo of the damaged Orion roadway
This is a photo of the repaired Orion washout
Another photo of the repair made
A bad spot in the pavement on Lily Pond was worked on this week. This is a before shot.
This is a shot of Lily Pond after the repair was made. It is now ready for chip and seal.
This photo is of the work being done on Driftwood. It is a work in progress and has not been completed yet.
This is a before photo of W. Woodland at Flaming Leaf.
This is photo after the repairs were made. It is now ready for chip and seal.
A new entry/exit at the dumpsters by the office was made. You can circle through.
Elk Run was graded this week
Fox Den was graded this week.
Another photo of the Driftwood repairs.
Here is another photo of the repairs being made to Lily Pond
Another photo of the repairs being made to W. Woodland and Flaming Leaf
Another photo of the completed repairs.
Brook Hill was graded this past week.
Dusk Dr. was graded and re-rocked this past week.
A large bad place in the road was dug out, base rock was put in and then 1" minus was put on top.
Th road was re-rocked this past week.
Rock was put down on Meramec Forest this past week.
Emerald Outlook was graded and rocked this past week.
Tosi was worked on and rock put down.
If you come across this road closed sign, please take an alternate route. The maintenance employees are working on the roads.
The area near the low water bridge was re-worked this week.
Here is another photo of the work done on W. Burr Oak
Here is another photo of the W. Burr Oak repair
Please do not drive around the road closed barriers, find an alternate route to your destination so our employees can get the roads repaired.
Woodland Lakes Office, 12 Woodland Lakes, Sullivan MO 63080. Phone: 573-468-6505 Gate: 573-468-8969. You can email us at info@wltmo.com